Workover equipment · Technical insights

Workover Rig Knowledge Center

Specification-led guidance for procurement teams, contractors and engineers evaluating workover equipment, lifting capacity and project fit.

Depth & load interpretationConfiguration reviewsBuyer checklists

Latest technical guides

Make better equipment decisions

Each guide separates documented specifications from project assumptions and converts technical details into practical procurement checks.

Red XJ650 truck-mounted workover rig parked on a paved yard with its white lattice mast lowered over the cabSpecification guide

XJ650 · Specification guide

XJ650 Workover Rig Specifications Explained

Review the published XJ650 servicing depth basis, maximum static load, 35 m mast and six-axle 12×8 chassis, and the conditions to confirm for your well program.

  • 8,500 m with 2-7/8 in EUE tubing
  • 1,575 kN max static load
  • 12×8 chassis
Read the XJ650 guide
Start truck-mounted workover rig selection from the well programSelection guide

Truck-mounted workover · Selection guide

How to Select a Truck-Mounted Workover Rig

Start from the well program, not the model name: define the heaviest job, tubular string, hook and mast loads, then carrier, climate and supplier documents.

  • Well-program first
  • Hook & mast loads
  • Document checklist
Read the selection guide

A practical reading path

How to use this knowledge center

Use the guides to frame technical clarification before a quotation becomes a purchase decision.

01

Read the rating in context

Keep depth, tubular condition, load definition and equipment configuration together.

02

Match the well program

Compare the actual tubular schedule, lifting loads, site conditions and planned work.

03

Request evidence

Ask for configuration-specific specifications, load documents, drawings and deviations.

Need help reviewing a workover rig configuration?

Share the well depth, tubular specifications, required loads and project location. Our team can help identify the questions and documents needed for a technical review.