Solid Control Systems

Oilfield solids-control systems separate drilled solids, support drilling-fluid treatment and help return usable fluid to the circulating system. Equipment should be selected as a process sequence, with each stage matched to the fluid, expected flow and solids load.

Hubei Link Petroleum Equipment Co., Ltd. discusses shale shakers, mud-cleaning and hydrocyclone packages, centrifuges, fluid-treatment modules, tanks, pumps and integrated system layouts. Final equipment ratings and included components are confirmed only against the buyer’s operating basis.

Solids-Control Equipment Scope

Screening
Shale shakers and screening equipment
Classification
Mud cleaners and hydrocyclone packages
Fine Separation
Centrifuges and fluid-treatment modules
Circulation
Tanks, pumps and integrated system arrangements

How to Match a Solids-Control System

Fluid and Solids Conditions

Provide the drilling-fluid type, expected flow rate, solids loading and the separation objective. These inputs are needed to decide which processing stages should be included and how they should work together.

Required Separation Result

The target cut point and fluid-recovery objective should be defined by the project. A proposal should not treat a single machine as proof that the complete process requirement will be met.

Site Layout and Utilities

Available footprint, installation format, tank arrangement, transfer path, power supply and connection points affect the system layout and the boundary between supplied and site equipment.

Operation and Integration

Confirm the required level of process integration, expected operating sequence and any customer-specified monitoring, inspection or documentation requirements before final selection.

Available System Arrangements

Published scope includes individual separation and treatment equipment, modular or skid-mounted process sections, and tank-and-pump arrangements for an integrated system. The exact combination, capacity and interfaces remain project-specific and will be listed in the technical proposal.

Typical Applications

  • Drilling-fluid solids removal
  • Mud treatment, recovery and recirculation
  • Well-site fluid-treatment packages
  • Modular or skid-mounted process systems

Technical Inquiry Checklist

Please provide the following available information so the proposed process sequence can be reviewed:

  • Equipment type and intended drilling-fluid application
  • Fluid type, expected flow rate and solids loading
  • Required separation or recovery objective
  • Available installation area and preferred skid or tank arrangement
  • Project country, climate and site utilities
  • Expected procurement quantity
  • Interfaces with existing tanks, pumps or piping
  • Applicable inspection, electrical or documentation requirements

Request a Solids-Control Proposal

Send the fluid data, flow requirement, solids condition, site layout, destination country, quantity and any project specification. Hubei Link will identify the information still needed before defining the equipment and process scope.

Send Process RequirementsDiscuss on WhatsApp

Request a Solids Control System Proposal

Tell Hubei Link about your equipment requirements and operating conditions.

Drilling-fluid type, required processing flow rate, target solids separation, mud properties, tank arrangement, available footprint, power supply and destination country.

WhatsApp +86 136 3626 9220 · info@workoverrigchina.com