MOBILE STEAM · OILFIELD SUPPORT
Oilfield Boiler TruckDongfeng Tianjin · 240 HP
Bring steam generation to your next field-service job. A truck-mounted boiler package with onboard water storage, diesel power and an enclosed equipment body.
Vehicle: YZZ5125TGLDF6 | Boiler: ZLSS1.0/5.0/270-Y
Share your destination, steam duty and operating conditions.

AN INTEGRATED FIELD-SERVICE PACKAGE
Steam, water and onboard power.
Ready for a focused configuration review.
Vertical integral-coil boiler
1,000 kg/h rated evaporation with a compact vertical once-through coil arrangement.
Water storage & diesel power
A 4,000 L water tank, 30 kW generator and shared 1 m³ superstructure fuel tank.
Enclosed equipment body
Double-layer enclosure, roof maintenance opening and radiator-side access door.
Specification basis: configuration information supplied for model YZZ5125TGLDF6. Maximum pressure, maximum temperature and rated evaporation are separate listed values; their simultaneous operating envelope must be confirmed against the boiler nameplate, performance data and approved operating manual.
Mobile Steam Heating for Oilfield Service Operations
An oilfield boiler truck brings a steam-generation package to the work location. This configuration can be evaluated for equipment heating, steam-assisted cleaning and winter field-service support where the receiving equipment, connections and procedures are approved for the selected steam conditions.
For a coordinated well-servicing package, review it alongside our truck-mounted workover rigs and oilfield chassis options. For winter projects, also review cold-climate operating requirements. Site suitability depends on water supply, fuel quality, access, ambient temperature and local pressure-equipment requirements.
Dongfeng Tianjin Boiler Truck Photos
Dongfeng Tianjin Boiler Truck Specifications
Vehicle and Chassis
| Complete vehicle model | YZZ5125TGLDF6 |
|---|---|
| Chassis / engine power | Dongfeng Tianjin / 240 HP |
| Gross vehicle mass | 12,500 kg |
| Overall dimensions, L × W × H | 8,500 × 2,500 × 3,500 mm |
| Wheelbase | 4,700 mm |
| Cab | D560 flat-roof extended cab |
| Engine / displacement | DDi47E240-60 / 4.7 L |
| Transmission | 8JS85TE-C |
| Front / rear axle, listed ratings | 3.6 t / 8 t |
| Leaf springs, front / rear | 8 / 10+8 |
| Frame section | 220 × 75 × 7 mm |
| Chassis fuel tank | 400 L, steel |
| Tyres | 275/80R22.5, 18PR |
Confirm the final certified axle loads, unladen mass and allowable water/fuel loading before transport. Listed axle ratings must be reconciled with the stated gross vehicle mass; tank capacities do not establish a legal full-tank driving payload.
Boiler and Auxiliary Equipment
| Boiler model | ZLSS1.0/5.0/270-Y |
|---|---|
| Boiler type | Vertical once-through boiler with integral coil |
| Rated evaporation | 1,000 kg/h (1 t/h) |
| Maximum outlet pressure | 5.0 MPa (50 bar) |
| Maximum outlet temperature | 270°C |
| Minimum inlet temperature | 5°C |
| Generator diesel engine | Weifang K4100D |
| Generator | STC-30; rated 30 kW, 50 Hz |
| Listed output voltage | 230–400 V / 50 Hz; confirm wiring and phase arrangement |
| Burner | Manufacturer-built burner |
| Listed burner fuel consumption | Approximately 36 kg/h; operating basis requires confirmation |
| Feedwater pump | Vertical BZ0720A plunger pump |
| Pump pressure / flow / speed | 7 MPa / 1 m³/h / 800 r/min |
| Pump power / motor | 3 kW / YB2-132M-6, 3 kW, 1,450 r/min |
| Control cabinet | YLZN-QX |
| Water tank | 4,000 L |
| Superstructure fuel tank | 1 m³, shared by burner and generator |
| Steam hose | 10 m, with specified discharge gun and protective handle; pressure/temperature compatibility to be verified |
The approximately 36 kg/h fuel figure is not a verified full-load consumption guarantee for 1,000 kg/h steam output. Request a heat-balance calculation and acceptance-test conditions, including feedwater temperature, steam pressure and fuel properties, before estimating operating cost. Pump pressure is not the boiler’s allowable operating pressure.
Vertical Integral-Coil Boiler and Enclosed Equipment Body
The boiler uses a multilayer vertical helical coil. Combustion air travels downward through passages around the boiler walls for preheating, then mixes with atomized fuel near the lower burner. Spark ignition initiates combustion, and the hot gas heats water flowing through the coil to generate steam. The integral-coil arrangement is intended to simplify coil replacement and service access.
The specified double-layer enclosure has a roof opening for boiler maintenance and a side access door at the engine radiator. Sealing is specified to reduce cold-air ingress during winter operation. Cable routing is protected and arranged to keep the working platform accessible. Enclosure sealing must preserve the ventilation and combustion-air provisions required by the final equipment design.
A magnetic water-treatment device is included in the supplied configuration. Feedwater suitability still needs to be checked against the boiler manufacturer’s water-quality limits; this device alone does not establish compliance with those limits. Operators select the control mode through the YLZN-QX cabinet according to the approved operating procedure.
Boiler Manufacturer, Quality Records and Delivery Scope
The supplied specification identifies Wuhan Jiangcheng Boiler Manufacturing Co., Ltd. (武汉江城锅炉制造有限公司) as the boiler manufacturer and cites Chinese Special Equipment (Boiler) Production Licence No. TS2142004-2024. It also states that manufacture is controlled under a boiler quality-assurance system and each unit is subject to supervision by the relevant Chinese safety authority.
Request the current licence copy and scope, unit-specific manufacturing and inspection records, boiler nameplate data, operating manual and acceptance documents for the offered unit. A cited Chinese production licence does not by itself demonstrate approval for installation or operation in another country. Hubei Link Petroleum Equipment Co., Ltd. is the enquiry contact for the proposed vehicle package; the boiler manufacturer is identified separately above.
Listed Onboard Accessories
- Two 8 lb fire extinguishers.
- One pry bar and one warning sign.
- Two ignition keys and two fuel-tank keys.
- 10 m boiler hose with the specified discharge gun and protective handle.
Safety and Winter Shutdown Considerations
This overview supports procurement review. Operation requires trained personnel, the unit-specific manual and approved site procedures.
- Use a firm, level location with a clear access route. Operators need appropriate protective clothing and head protection.
- Inspect the vehicle, cables, grounding and hose connections before use. Repair damaged or aged cables before energizing the equipment.
- Fill the coil with clean water before ignition and maintain the feedwater supply throughout operation. Confirm feedwater temperature meets the listed minimum of 5°C.
- Keep personnel out of the designated high-pressure zone at the pump head, burner front and within 5 m of high-pressure pipe joints, as specified in the supplied safety notes.
- Stop combustion before ending cooling-water circulation. The supplied instructions require continued pumping until the temperature falls below 60°C before disconnecting pump and system power.
- After safe cooldown and depressurization in accordance with the manual, drain the coil and pump to prevent freezing. Double-layer bodywork does not replace winterization.
- Do not refuel near flames or smoking. Stop engines before work on drive systems. Do not pour water into a burning combustion chamber.
- Evaluate hazardous-area suitability, vehicle exhaust fire protection and all steam-discharge fittings before deployment. No hazardous-area certification is established by the listed component models.
Valve sequencing, emergency shutdown and residual-fire response must follow the approved manual for the actual unit. Confirm all required protections, relief devices, alarms and interlocks during the technical review.
Oilfield Boiler Truck FAQ
What is the steam capacity of this oilfield boiler truck?
The supplied rated evaporation is 1,000 kg/h, equivalent to 1 tonne per hour. Actual output and fuel consumption depend on the confirmed operating conditions.
What are its maximum steam pressure and temperature?
The listed maximum outlet pressure is 5.0 MPa and maximum outlet temperature is 270°C. Confirm the permitted pressure-temperature combination and steam condition with the manufacturer before specifying a duty point.
Does the truck have an onboard power supply?
Yes. The supplied package lists a Weifang K4100D diesel engine driving an STC-30 generator rated at 30 kW and 50 Hz. Confirm the required voltage, phase arrangement and external-power connection before ordering.
Can this Dongfeng boiler truck be used in winter?
The configuration includes a double-layer enclosure and sealing provisions. Winter suitability requires a site-specific review of starting, water and fuel systems, insulation, ventilation and freeze protection. The listed minimum water inlet temperature is 5°C.
What information is needed for an export quotation?
Provide the destination country, application, required steam flow, pressure and temperature, ambient conditions, water quality, fuel specification and vehicle-registration requirements. Request the final loading calculation, documentation scope and performance acceptance conditions with the quotation.
LET’S DEFINE YOUR STEAM DUTY
Get the right boiler truck
for your operating conditions.
Send your requirements to Hubei Link Petroleum Equipment Co., Ltd. for a configuration review and quotation.
+86 136 3626 9220 · info@workoverrigchina.com
For a focused proposal, share:
- Destination country and planned application
- Required steam flow, pressure and temperature
- Ambient conditions and feedwater quality
- Fuel specification and registration requirements
Request a Oilfield Boiler Truck Proposal