Used Equipment / Coiled Tubing
LGT450
Coiled Tubing Unit
Heavy-duty coiled tubing equipment with DDC S60 power and a ZRT-100K injector. Explore the recorded specifications and actual equipment photos.
Request Price & Inspection →
Main Specifications
| Item | Recorded specification |
|---|---|
| Brand / model | Jereh / LGT 450 |
| Configuration | Coiled tubing operation semi-trailer |
| Manufacture date | 2019/04 — main nameplate |
| Engine | DDC S60; engine information plate: S60 6063HV39 |
| Rated engine power | 525 hp @ 2,100 rpm |
| Injector maximum pulling capacity | 450 kN |
| Nameplate weight including tubing | 76,800 kg |
| Overall dimensions, L × W × H | 16,300 × 3,000 × 4,350 mm |
| Reel size marking | 148–80–90 inches, as marked on main plate |
| Reel / tubing entry in equipment register | 2-inch × 6,000 m; actual installed string specification and usable length require verification |
ZRT-100K Injector Head
| Maximum speed | 52 m/min (170 ft/min) |
| Continuous lifting capacity | 45,000 kg / 100,000 lb, as marked |
| Continuous snubbing capacity | 22,500 kg / 50,000 lb, as marked |
| Tubing OD range | 1-1/2 to 3-1/2 inches |
| Injector weight | 4,900 kg |
| Injector dimensions | 1,705 × 1,565 × 2,662 mm |
These are original nameplate ratings, not a statement of current tested performance. Tubing size changes require compatible grippers, guides and pressure-control components.
Pressure Control & Auxiliary Equipment
The supplied register lists a J&N JLGH 4-1/16–15K BOP and stripper packer. The photographed stripper plate specifies a 4-1/16-inch bore, 15,000 psi working pressure, 3,000 psi rated control pressure, and a −20°F to 250°F working temperature range. Its H₂S service marking must be checked against material records and current certification before service. Component ratings do not establish the pressure rating of the complete assembled package.
The auxiliary generator plate records 220 V, 50 Hz, 8.0 kVA rated output and 8.8 kVA maximum output, manufactured in November 2018.
Used Condition & Supply Scope
This listing describes used equipment shown in the supplied photographs. Refurbishment completion, engine hours, pressure-test status and tubing fatigue history have not been established by the supplied material. Agree the inspection, repair, testing, documentation and final included-equipment list in the quotation.
- Verify engine hours, start-up performance, hydraulic leaks and operating controls.
- Inspect injector chains, grippers, bearings and load functions.
- Confirm tubing OD, wall thickness, grade, remaining length and fatigue records.
- Verify pressure-control serial numbers, maintenance records and required tests.
- Review semi-trailer structure, brakes, tyres, axle loads and destination transport requirements.
The source register contains a July 2019 date and an identifier that differs from the main plate. April 2019 is used here from the physical nameplate; identity and documentation must be reconciled during inspection.
Request a Unit-Specific Proposal
Send your destination country, intended well program, required tubing size and length, working pressure, inspection requirements and preferred refurbishment scope. Ask for current price, equipment availability, an agreed supply list and shipping dimensions.
Equipment Gallery



Discuss This Unit With Our Team
Share your destination, tubing requirements and inspection scope for a unit-specific proposal.
Start Your Equipment Inquiry →